The scope of work included; sewerage system, TSE/ Irrigation Water, Potable Water, Fire Main. The sewerage comprised a network of approximately 12km of network, ei pipe work, manhole, chambers, discharge, washout chambers, pumping stations (4) associated valve chambers (4) and MCC panels.
The sewerage system runs 3/4 of the way around the crescent eastwards from Jebel Ali Island, to the STP on plot GG on United Arab EmiratesLand Island as a pumped/ gravity system, and from the end of plot United Arab Emiratesto ploy GG as a gravity only system.
The system can be divided into 5 sections as follows; Jebel Ali Island, Main Crescent West, Atlantis Main Crescent West, Atlantis Main Crescent East, Atlantis-United Arab EmiratesLand.
This project covered the upgrade of the existing Pump Station "S" and the construction of a new pumping station 'Sn' to serve the catchment area.
The scope of work included; sewerage system, TSE/ Irrigation Water, Potable Water, Fire Main. The sewerage comprised a network of approximately 12km of network, ei pipe work, manhole, chambers, discharge, washout chambers, pumping stations (4,) associated valve chambers (4) and MCC panels.
Construction of new Roadways, Parking areas, Side walks, Storm Water Drainage, Sewerage Network, Water Supply Network, Power Supply Network, Road Lighting, Telecommunication Network, Utility Relocation and/or Protection, Landscape works and other related construction.