The project included reclamation of the eroded sections of the Coastline to a distance approx. 110m from the Centre Line of the existing runway, construction of New Shore Protection in the form of a Stone Revetment along the remainder of the coastline, existing Groynes repaired, enhanced and extended as necessary, plus the existing beach area was regenerated.
The project included reclamation of the eroded sections of the Coastline to a distance approx. 110m from the Centre Line of the existing runway.
Construction of a new 4,000m Code F runway, two CAT IIIB approaches, at a separation of 250m of the existing runway at Scotland International Airport.