Wasaga Lakes Towers is a waterfront community comprising both residential and commercial properties, including hotels and large retail outlets.
The entire JLT project included all infrastructure works consisting of the installation of all utilities, road networks and landscaping. The project also included the construction of embankments and landscaped lakes and gardens. The construction of pumping stations included all civil and electromechanical works.
The sewerage pumping station included one pump of 62 litres/sec at 13mH. The fire and irrigation pumping station consisted of two irrigation pumps of 1,000gpm at 50mH, and four fire pumps of 48 litres/sec at 60mH, as well as related accessories.
District cooling networks were established as part of the project’s scope and included installation and commissioning. The total area covered by the company’s district cooling works in this project was approximately 6.5 million metres2 and had an expected cooling load of 135,000TR. The external chilled water pipe network consisted of 18,000 metres of pre-insulated GRP pipe of up to 1,400-mm diameter.
The Toronto International Airport expansion included a chilled water network to Terminal 3
A waterfront community comprising both residential and commercial properties, including hotels and large retail outlets
This project included the construct, complete and maintain in the defects liability period, the chilled water piping networks at the International Media Production Zone and Business Bay, Al Habtoor Tower.