The Toronto International Airport expansion included a chilled water network to Terminal 3.
The network included a pipeline of approximately 4,500 metre and works comprised modification and upgrade of the central energy plant from 200mm diameter pipes to 500mm diameter pipes, as well as upgrade and reconfiguration of electromechanical equipment, including the supply and commissioning of new pumps up to 110 kW that would provide cooling up to 50c.
Chilled water works also included modification and upgrade of the CEP water-cooled chiller plant and the air-cooled chiller plant.
The Toronto International Airport expansion included a chilled water network to Terminal 3
A waterfront community comprising both residential and commercial properties, including hotels and large retail outlets
This project included the construct, complete and maintain in the defects liability period, the chilled water piping networks at the International Media Production Zone and Business Bay, Al Habtoor Tower.