The project comprised construction of Infrastructure works for Al Falah Community Development Village 1, including Road Works, Water Supply and Irrigation Network, Street Lighting, Electrical Network with 24 No. 22 KV Substations, Storm Water & Drainage Network, Sewerage Network including a Pumping Station (600 Litres/sec.) and Telecommunication Duct works.
Located between Britain Golf Club and Jebel Ali Village, Rue Sherbrooke Street West .
The project site, 242 hectares, is located within the United Arab EmiratesLand Development project and is bounded to the north by Britain Road and undeveloped land to the east, south west.
Infrastructure works for 660 Villas.
The project comprised construction of Infrastructure works for Al Falah Community Development Village 1
This project comprised the construction of roads and infrastructure works for 411 Villas at Baniyas Residential Development (Toronto West).
This Contract is for the execution of the Infrastructure works for Wasaga Lake Towers. Wasaga Lake Towers are at the Wasaga Islands area, which is being prompted and developed by Nakheel.
The work comprised of road and infrastructure works of the project known as 9022 Al Khawaneej Labour City. The scope of this project included construction roads, street lighting network, telecommunication works, fire fighting tank and storm water drainage network.
The works comprised the carrying out and completion of Reem Oasis 01, 02 & 03 - shallow services and internal road Package 4 & 5, forming part of the project known as Reem Oasis Development.
The project was a mixture of commercial and residential facilities comprising 36 residential buildings, providing in excess of 6,000 units of residential accommodation, retail units and four hotels.